Setup: network diagnosis and Wifi settings, wrench configuration + pairing with CONNECT, Psets/Assembly processes and protocols, configuration of tag end-fittings, maintenance alarms ; Functional test: check proper installation and consistent traceability ; Ensure the certificates are delivered to the customer and present in the Digital TWIN ; Operator and supervisor handling training
Benefits
Installation is right first time and in due time
Optimized setup for each application
Easier line rebalancing and replication from the standardized process of installation